Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
en:mirally:rally:tramos [2026/06/02 09:22] – Automatic push translation joanen:mirally:rally:tramos [2026/09/16 08:45] (current) joan
Line 1: Line 1:
-====== Sections ======+====== Stages ======
  
-When importing the PCs, the legs are created automatically. If the PCs have been created with the Roadbook Designer and the averages are correct, there is no need to upload the Excel of averagesbecause the PCs already have the times calculated correctly.+When importing the CP data, the stages are created automatically. If the CPs have been created using the Roadbook Designer and the split times are correct, there is no need to upload the Excel file containing the split timesas the split times for the CPs have already been calculated correctly.
  
-If there are several averages or they have not been imported correctly from the Roadbook Designer:+If there are multiple average speeds or they have not been imported correctly from Roadbook Designer:
  
 <WRAP box noteyellow> <WRAP box noteyellow>
-  - Download the sample excel from MiRally.+  - Download the sample Excel file from MiRally.
   - Fill in the data with the speeds.   - Fill in the data with the speeds.
-  - The name of the sections (example ZR1) must be the same as the name of the sections in the PCs Excel.+  - The name of the stages (e.g. ZR1) must be the same as the names of the stages in the PC Excel file.
 </WRAP> </WRAP>
  
-{{es:mirally:images:medias.png}}+{{es:mirally:images:medias.png}} 
  
 <WRAP box noteyellow> <WRAP box noteyellow>
 <WRAP indent> <WRAP indent>
-4. Upload Excel. \\ +4. Upload the Excel file. \\ 
-5. Select the average of the PCs (Average 1/ Average 2...)+5. Select the average from the PCs (Average 1 / Average 2...)
 </WRAP> </WRAP>
 </WRAP> </WRAP>
  
-{{es:mirally:images:tramos.png}}+{{es:mirally:images:tramos.png}} 
  
-By clicking on the pencil we can edit the fields. In the calculator we can check the mean and select another meane.g. Mean 2.+By clicking on the pencil icon, you can edit the fields. In the calculator, you can check the average and select another averagefor example, Average 2.
  
 \\ \\
  
 <WRAP danger> <WRAP danger>
-When we have created the zPass section because there are pass-through PCs, the Inhert parameter must be changed to YES.+If there are intermediate PCs that are not sorted in the PC Excel file and are at the end of the listyou must change the Inhert parameter to YES in the zPaso stage.
 </WRAP> </WRAP>
  
 <WRAP caution> <WRAP caution>
-To unpublish a section we must remove the public tick.+To unpublish a stage, you must untick the ‘Publish’ box.
 </WRAP> </WRAP>
  • en/mirally/rally/tramos.1780392175.txt.gz
  • Last modified: 2026/06/02 09:22
  • by joan